Product

Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine
Two waves highway guardrail roll forming machine

Two waves highway guardrail roll forming machine

HX-W Beam guardrail
Production Time: 30-35 working days Shipping Time: 40 days Port: Tianjin Whatsapp: + 86 18920635761 E-mail: lisa@hx-machinery.com

Highway Guardrail Roll Forming Machine: Precision Engineering for Safer Roads, Backed by 28 Years of Excellence

For nearly three decades, we have stood at the forefront of roll forming technology, engineering robust solutions for critical infrastructure worldwide. Our expertise culminates in the two waves highway guardrail roll forming machine-a pinnacle of precision, speed, and reliability designed specifically to manufacture the galvanized steel guardrails essential for highway safety. Trusted by manufacturers globally, this machine embodies our commitment to quality and innovation, delivering the consistent, high-strength profiles demanded by rigorous international standards.

Workflow Diagram

highway guardrail roll forming machine

highway guardrail roll forming machinehighway guardrail roll forming machinehighway guardrail roll forming machinehighway guardrail roll forming machinehighway guardrail roll forming machinehighway guardrail roll forming machinehighway guardrail roll forming machine

 

More parameters

Product Name two waves highway guardrail roll forming machine
Punching Three groups, one group of middle holes and two groups of side holes
Structure 500H Beam
Main motor power Dual 22KW motors + K107 reducer
Hydraulic station motor power 22kw
Cutting type Hydraulic three-piece shear
Produce speed 5-15m/min
Shaft material Cr12MoV
Brand of electrical control cabinet Delta or customized according to customer requirements
Touch screen/inverter Delta or customized according to customer requirements
Rolling materials High quality CR12 quenching
Cutting blade material Cr12, treatment off 58 ℃ -60 ℃
Roller diameter Φ120mm
Voltage 380v 50hz 3p be customized
Feeding thickness 2.0-4.0mm
Rows 15-18
Size 14 meters long × about 2.4 meters wide
Voltage 380V
Feeding width 465- 475mm 

 

Machine Introduction: The Backbone of Road Safety Manufacturing

A two waves highway guardrail roll forming machine is a heavy-duty, continuous roll forming system engineered to transform high-tensile strength steel coils (typically 2.0mm to 4.0mm thick, often galvanized GI or color-coated PPGI) into the standardized W-beam profiles that form the protective barrier systems lining highways. These profiles must exhibit exceptional dimensional accuracy, consistent shape, and uniform strength along their entire length to perform reliably upon impact.

Our machine, refined over 28 years, incorporates features critical for guardrail production:

Heavy-Gauge Capability: Robust construction with reinforced frames and high-torque drives to handle thick, high-strength steel without deflection.

High-Precision Forming Stations: Meticulously designed and hardened steel forming rolls, precisely aligned to progressively shape the steel into the complex W-beam profile with exacting tolerances.

Integrated High-Tonnage Punching Unit: A crucial subsystem for creating the consistent bolt holes required for guardrail splicing and post attachment. Capable of punching multiple holes simultaneously with high accuracy and minimal burrs.

Advanced PLC Control System: Centralized control for setting profile parameters, punching patterns (hole spacing, size), production length, speed, and monitoring operational status. Features recipe storage for different guardrail types.

Robust Cutting System: Utilizes high-force hydraulic shearing or heavy-duty flying cutters capable of cleanly severing the thick, formed profile without deformation.

Material Handling: Includes heavy-duty uncoilers/decoders, entry guides, and often levellers to handle thick coils and ensure flat material entry.

Application Scenario

highway guardrail roll forming machinehighway guardrail roll forming machine

Our photos with our customers

Our photos with our customers

Our photos with our customers

Our photos with our customers

 

Why Choose Us?

Company Strength

Company Strength

 

About us

We, Tianjin Haixing a professional cold roof roll forming machine manufacturer, we have been focusing on this field for 28 years and support ODM/OEM, our equipment includes roof roll forming machine, floor deck roll forming machine, automatic decoler, shutter door roll forming machine, light keel roll forming machine, purlin machine, cable tray punch machine, and other related construction equipment. We are cooperating with 150+ countries & 5,000+ Partners.

HX Group

 

FAQ


Q: Are you a trading company or a factory?
A: We are a factory with a professional production team and service consciousness, just for exporting various types of cold roll forming machines.

Q: Can a machine produce only one style of panel profile?
A: Not complete. Suitable for a two waves highway guardrail roll forming machine. It can produce more than 3 panels.

Q: How long does it take to manufacture the machine?
A: In general, the two waves highway guardrail roll forming machine be completed in 20 to 45 business days. But if you need machines urgently, we can save you time.

Q: Is there quality control when producing the production line?
A: Yes, we have a team that is responsible for quality control, including the laying of raw materials, processing rolls and other parts, processing, assembly, testing, and packaging on the roll surface and shaft.

Q: What can you do if the machine breaks?
A: Our machine is warranted for 24 months. If the damaged part cannot be repaired, we can send a new part to replace the damaged part, but you will need to pay the courier fee yourself. If the warranty period is exceeded, we can resolve the issue through negotiation, and we provide technical support for the entire life cycle of the device.

Home Products Contact